| TRACK RECORDS |
| TRANSMISSION & DISTRIBUTION GROUP |
| Sl.No |
Description of Works |
Length-KM |
Value-Rs in Lacs |
Client |
Profile/Soil Type |
Year of compln |
| 1 |
400KV D/C Khandwa-Rajgarh &LILO Korba-Raipur |
102 |
4,652 |
PGCIL |
undulated terrain |
2008 |
| 2 |
400KV D/C Sujalpur-Nagda |
167 |
7,088 |
PGCIL |
Plain,BC Soil |
2007 |
| 3 |
400KV S/C Vindyachal-Pratappur |
140 |
4,004 |
PGCIL |
undulated terrain |
2007 |
| 4 |
110KV Kurumbapet-Sedarapet-Bahour-Bahour |
13 |
308 |
PGCIL |
undulated terrain |
2007 |
| 5 |
400KV S/C Meerut-Muzaffarnagar |
37 |
836 |
PGCIL |
Plain,BC Soil |
2006 |
| 6 |
400KV D/C Nelamangala-Mysore |
134 |
4,300 |
PGCIL |
consolidated/rocky |
2006 |
| 7 |
400KV D/C Vishnuprayag-Muzaffarnagar |
93 |
4,400 |
PGCIL |
plain/high water atble (Ganga river crossing) |
2006 |
| 8 |
400KV S/C Hyderabad-Kurnool-Gooty |
307 |
3,508 |
PGCIL |
undulated/rocky |
2005 |
| 9 |
400KV D/C Ramagundam-Hyderabad |
202 |
4,176 |
PGCIL |
undulated/rocky |
2004 |
| 10 |
230KV D/C pillaipermanallur-Thiruvarur-Thanjavur |
112 |
2,576 |
TNEB |
plain |
2001 |
| 11 |
400KV D/C Jabalpur-Itrasi |
234 |
2,040 |
PGCIL |
undulated/rocky |
1998 |
| 12 |
220KV D/C Muddanur-Cuddapah |
57 |
84 |
APSEB |
undulated/rocky |
1995 |
| 13 |
400KV D/C Trichy-Madurai |
64 |
355 |
PGCIL |
plain |
1995 |
| 14 |
400KV S/C Gandhar-Par-River crossing |
155 |
1,884 |
PGCIL |
High water table |
1995 |
| 15 |
400KV S/C Madurai-Udymalpet |
66 |
300 |
NLC |
plain |
1992 |
| 16 |
220KV D/C Visakapattanam-Garividi |
95 |
64 |
APSEB |
plain |
1991 |
| 17 |
400KV D/C Trichy-Madurai |
117 |
140 |
MSEB |
plain |
1991 |
| 18 |
400KV S/C Korba-Bhilai |
57 |
32 |
NTPC |
consodidate/Rocky |
1990 |
| 19 |
220KV D/C Ramagundam-Warangal |
90 |
100 |
APSEB |
consodidate/Rocky |
1989 |
| 20 |
400KV D/C Jaisingnagar-Jabalpur |
101 |
44 |
NTPC |
consodidate/Rocky |
1989 |
| 21 |
132 KV D/C Paruchur-Chilakaluripet |
17 |
11 |
APSEB |
Plain |
1988 |
| SUB STATION & RURAL ELECTRIFICATION |
| 1 |
33KV Line/Substation-Raebareli-33KV-52.7Km/11KV-31.2Km/LT-77.4km-11SSAPDRP |
|
2,359 |
PGCIL |
plain |
2009 |
| 2 |
33KV Line/Substation-Sultanpur-33KV-26.3Km/11KV-140.9Km/LT-63.8km-12SSAPDRP |
|
2,572 |
PGCIL |
Plain |
2009 |
| 3 |
11KV Line&consumer connection-Bharuch |
|
1,788 |
PGCIL |
undulatedterrain |
2007 |
| 4 |
33/11KV Substation Mallapuram-33KV-137Km/11KV-37Km |
|
834 |
KSEB |
hilly/rocky |
2003 |
| 5 |
110/33/11KV Substation-Mellatur-110KV-19Km/33KV-132Km/11KV-43KM |
|
543 |
KSEB | undulated terrain
2003 |
| 6 |
33/11KV Substation Chittor-33KV-171Km/11KV-78Km |
|
1,924 |
APSEB |
undulated terrain |
1999 |
| 7 |
110/6.6KV Switchyard/Substation-ECH Plant-Manali |
1bay |
240 |
Petro Aralite |
plain |
1999 |
| 8 |
110/6.6KV Switchyard-Alkali Plant-Tuticorin |
1Bay |
272 |
TAC |
plain |
1999 |
| 9 |
21.6MVA ,110/6.6KV Substation-Cuddalore |
2Bays |
256 |
SPIC PHARM A |
plain |
1995 |
| 10 |
400/132/33KV Substation-Anpara |
11bays |
404 |
UPSEB |
plain |
1993 |
| 11 |
110/6.6KV Switchyard lab Plant-Manali |
2Bays |
320 |
TNPL |
plain |
1987 |
|
RAILWAY ELECTRIFICATION |
Tkm/Rkm |
| 1 |
Karepalli-Bhadrachalam-Managuru |
186/85 |
1,657 |
CORE |
consolidated/rocky |
2009 |
| 2 |
Najibabad-Khalanapura |
246/95 |
1,216 |
CORE |
plain |
2008 |
| 3 |
korrukupet OHE |
37/17 |
596 |
RE/MDS |
plain |
2005 |
| 4 |
Lucknow Goods yard |
16.1/3 |
188 |
CORE |
plain |
2005 |
| 5 |
Bhubaneshwar-Chatrapur |
365/220 |
1,936 |
CORE |
undulated terrain |
2004 |
| 6 |
Guindy,Egmore,Tambaram Switching station |
3Nos |
244 |
RE/MDS |
plain |
2003 |
| 7 |
Villupuram-Acharapakkam |
60/35 |
192 |
RE/MDS |
plain |
2001 |
| 8 |
Mecheri yard siding-SIS COL |
2.17/2.17 |
60 |
SISC OL |
plain |
2001 |
| 9 |
Vijayawada-Nidadavolu |
313/170 |
1,087 |
CORE |
BG Soil |
1998 |
Note:
- Having experience of stringing more than 3500 Kms length of 400 kV Double circuit Transmission Lines, we are now qualified for quoting upto 765 kV Transmission Lines
- Executed orders won from International compettive bidding.
- By executing Tuticorin -Sivalarpatti Lines (400 Kv QUAD), we will be qualified for quoting / Participating of Tender of 800 kV HDVC and Multiple Bundle conductor Lines.
- Eligible for High Value Railway Electrification jobs on Turnkey basis.
- Based on execution of TNEB Turnkey Project at Tanjore, we are qualified to quote for 400 kV Transmission Line Turnkey Projects.
- By execution of 33 KV lines and Sub Stations at Rural Villages, we have qualified to quote for APDRP and RGGVY Projects.
|
| O & M SERVICES |
| SlNo |
Client |
Description |
| 1 |
M/s. CPCL, Chennai |
Shutdown job for FCCU crude - II, OHCU & HGU |
| 2 |
M/s. Tata Chemicals,Haldia |
Erection & commissioning of Belt and Pan filters |
| 3 |
M/s. CPCL, Chennai |
Shutdown job for Co - Generation |
| 4 |
M/s. IJC, Jordan |
Re tubing of exchanger |
| 5 |
M/s. MCCPTA |
Deputation of skilled manpower CTA & PTA dryer |
| 6 |
M/s. L&T |
Commissioning services |
| 7 |
M/s. IFFCO, Kalol |
Major O/H & Preventive maintenance of Amm. & urea |
| 8 |
M/s. IFFCO, Kalol |
Major O/H & Preventive maintenance of equipment |
| 9 |
M/s. BMC, Mumbai |
O/H of sulzer pumps |
| 10 |
M/s. SFCL, Kota |
NDT of Ammonia and Urea Plant Equipments |
| 11 |
M/s. IOCL, Panipat |
Health assessment of reformer tubes |
| 12 |
M/s. Rama Petrochemicals |
Fabrication & erection of NG Pipe lines |
| 13 |
M/s. IFFCO, Kalol |
Maintenance of Ammonia Plant Rotating Machinery |
| 14 |
M/s. Ispat Industries |
Replacement of bearing bush |
| 15 |
M/s. CFCL, Kota |
NDT Inspection of reformer tubes |
| ENGINEERING SERVICES GROUP |
| COMPLETED |
| Sl No |
PROJECT TITLE |
CLIENT |
| 1 |
DETAILED ENGINEERING & PROJECT MANAGEMENT SERVICE FOR SOAP NOODLE, SPLITTER, GLYCERINE & DISTILLATION EXPANSION PROJECT. |
PAN CENTURY EDIBLE OILS SDN. BHD., MALAYSIA |
| 2 |
DESIGN & DETAIL ENGINEERING FOR POLYISOBUTYLENE PROJECT |
PERIMETRA TECHNOLOGIES PVT LTD, CHENNAI |
| 3 |
DETAIL ENGINEERING DRAWINGS FOR AIR FIN COOLER STRUCTURES |
GEA ENGERY SYSTEM LTD,CHENNAI |
| 4 |
DESIGN AND DETAILING OF 10000 M3 FO STORAGE TANK |
DIAMOND ENGINEERING PVT LTD, CHENNAI |
| 5 |
ALUMINIUM FLOURIDE PLANT REVAMP |
SPIC,TUTICORIN |
| 6 |
DESIGN & DETAILING OF REFINERY PRESSURE VESSELS. |
SPIC JEL ENGINEERING CONSTRUCTION LTD / DLM MOROCCO. |
| 7 |
DESIGN & DETAILNG OF CONVERTOR PRIMARY OFF - GAS DUCTING |
STERLITE INDUSTRIES LTD,TUTICORIN. |
| 8 |
PREPARATION OF 3D MODELING FOR ORE CONCENTRATOR PROJECT |
THE BATEMAN ENGINEERING PVT LTD,BANGALORE. |
| 9 |
SMELTER OUTLET DUCT STRESS ANALYSIS AND SUPPORTS DESIGN |
STERLITE INDUSTRIES LTD,TUTICORIN. |
| 10 |
DESIGN & DETAILING OF SMELTER HYGINE VENTILATION SYSTEM |
STERLITE INDUSTRIES LTD,TUTICORIN. |